Follow this link to skip to the main content

SPD SEIS References for Appendix B

 

Cantey, T., 2008, “Documentation of Alternatives Analysis to Define WSB Scope,” National Nuclear Security Administration, Aiken, South Carolina, August 21.

21

DNFSB (Defense Nuclear Facilities Safety Board), 2003, Plutonium Storage at the Department of Energy’s Savannah River Site, Report to Congress, Washington, DC, December.

363

DOE (U.S. Department of Energy), 1994, Final Supplemental Environmental Impact Statement, Defense Waste Processing Facility, Savannah River Site, Aiken, South Carolina, DOE/EIS-0082-S, Savannah River Operations Office, Aiken, South Carolina, November.

47

DOE (U.S. Department of Energy), 1995a, Savannah River Site Waste Management Final Environmental Impact Statement, DOE/EIS-0217, Savannah River Operations Office, Aiken, South Carolina, July.

347

DOE (U.S. Department of Energy), 1995b, Final Environmental Impact Statement, Interim Management of Nuclear Materials, DOE/EIS-0220, Savannah River Site, Aiken, South Carolina, October.

348

DOE (U.S. Department of Energy), 1996c, Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic Environmental Impact Statement, DOE/EIS-0229, Office of Fissile Materials Disposition, Washington, DC, December.

51

DOE (U.S. Department of Energy), 1997, Waste Isolation Pilot Plant Disposal Phase Final Supplemental Environmental Impact Statement, DOE/EIS-0026-S-2, Carlsbad Area Office, Carlsbad, New Mexico, September.

54

DOE (U.S. Department of Energy), 1999, Surplus Plutonium Disposition Final Environmental Impact Statement, DOE/EIS-0283, Office of Fissile Materials Disposition, Washington, DC, November.

57

DOE (U.S. Department of Energy), 2002, Supplement Analysis for Storage of Surplus Plutonium Materials in the K-Area Material Storage Facility at the Savannah River Site, DOE/EIS-0229-SA-2, Office of Environmental Management, Washington, DC, February.

61

DOE (U.S. Department of Energy), 2003, Changes Needed to the Surplus Plutonium Disposition Program, Supplement Analysis and Amended Record of Decision, DOE/EIS-0283-SA1, Office of Fissile Materials Disposition, Washington, DC, April.

65

DOE (U.S. Department of Energy), 2005a, “High Level Waste System at SRS,” HLW Overview, January 19.

364

DOE (U.S. Department of Energy), 2005b, Savannah River Site End State Vision, Aiken, South Carolina, July 26.

73

DOE (U.S. Department of Energy), 2005c, Environmental Assessment for the Safeguards and Security Upgrades for Storage of Plutonium Materials at the Savannah River Site, DOE/EA-1538, Savannah River Operations Office, Aiken, South Carolina, December.

74

DOE (U.S. Department of Energy), 2006, “Startup of Second Nuclear Waste Storage Facility at the Savannah River Site,” DOE News, Savannah River Operations Office, Aiken, South Carolina, July 10.

365

DOE (U.S. Department of Energy), 2007a, Plan for Alternative Disposition of Defense Plutonium and Defense Plutonium Materials That were Destined for the Cancelled Plutonium Immobilization Plant, Washington, DC, August.

80

DOE (U.S. Department of Energy), 2007b, Supplement Analysis Storage of Surplus Plutonium Materials at the Savannah River Site, DOE/EIS-0229-SA-4, Office of Environmental Management, Washington, DC, September 5.

81

DOE (U.S. Department of Energy), 2007c, “Saltstone Successfully Resumes Operations,” Savannah River Site News and Events, November 28.

366

DOE (U.S. Department of Energy), 2008a, Final Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico, DOE/EIS-0380, National Nuclear Security Administration, Los Alamos Field Office, Los Alamos, New Mexico, May.

87

DOE (U.S. Department of Energy), 2008b, Supplement Analysis for Construction and Operation of a Waste Solidification Building at the Savannah River Site, DOE/EIS-0283-SA-2, Savannah River Operations Office, Aiken, South Carolina, November.

90

DOE (U.S. Department of Energy), 2011, Final Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico, DOE/EIS-0350-S1, National Nuclear Security Administration, Los Alamos Field Office, Los Alamos, New Mexico, August.

109

DOE (U.S. Department of Energy), 2012a, Stabilization, Packaging, and Storage of Plutonium-Bearing Materials, DOE-STD-3013-2012, Washington, DC, March. 

114

DOE (U.S. Department of Energy), 2012b, Transuranic Waste Transportation Containers (accessed March 16, 2012, http://www.wipp.energy.gov/fctshts/factsheet.htm#).

367

DOE (U.S. Department of Energy), 2012c, “TRANSCOM, Shipment Tracking, U.S. Department of Energy,” (accessed at http://tcc.transcom.energy.gov), May 14.

368

LANL (Los Alamos National Laboratory), 2012, Surplus Plutonium Disposition Supplemental Environmental Impact Statement Data Call Response, Los Alamos, New Mexico.

186

NRC (U.S. Nuclear Regulatory Commission), 2005, Environmental Impact Statement on the Construction and Operation of a Proposed Mixed Oxide Fuel Fabrication Facility at the Savannah River Site, South Carolina, NUREG-1767, Office of Nuclear Material Safety and Safeguards, Washington, DC, January.

213

SRNS (Savannah River Nuclear Solutions, LLC), 2012, Surplus Plutonium Disposition Supplemental Environmental Impact Statement, Data Call Response, Aiken, South Carolina.

278

SRR (Savannah River Remediation, LLC), 2009a, Interim Salt Waste Processing: Actinide Removal Process and Modular Caustic Side Solvent Extraction Unit, Aiken, South Carolina, November.

369

SRR (Savannah River Remediation, LLC), 2009b, Defense Waste Processing Facility, Aiken, South Carolina, November.

279

SRS (Savannah River Site), 2006, Waste Study for the Plutonium Disposition Project in the K Area Complex, SK-DA-WM-0001, Rev. B, Aiken, South Carolina, November 9.

370

SRS (Savannah River Site), 2007a, Facts About the Savannah River Site:  Defense Waste Processing Facility, Washington Savannah River Company, Aiken, South Carolina, December.

324

SRS (Savannah River Site), 2007b, Scope of Work M-SOW-K-00022, Rev. 0, for Balance of Plant – Water Systems (U), Plutonium Disposition Project (U) Project M09A, March.

371

SRS (Savannah River Site), 2007c, Scope of Work M-SOW-K-00021, Revision 0, for Balance of Plant – Air Systems (U), Plutonium Disposition Project (U) Project M09A, April.

372

SRS (Savannah River Site), 2007d, Scope of Work M-SOW-K-00019, Revision 0, for Oxidation System (U), Plutonium Disposition Project (U) Project M09A, March.

282

SRS (Savannah River Site), 2007e, Scope of Work M-SOW-K-00014, Revision 0, for Milling and Mixing System (U), Plutonium Disposition Project (U) Project M09A, March.

373

SRS (Savannah River Site), 2007f, Scope of Work M-SOW-K-00011, Revision 0, for Vitrification System (U), Plutonium Disposition Project (U) Project M09A, March.

374

SRS (Savannah River Site), 2007g, Scope of Work M-SOW-K-00017, Revision 1, for Can-in-Canister Loading, Storage, and Transport System (U), Plutonium Disposition Project (U) Project M09A, March.

375

SRS (Savannah River Site), 2007h, Facts About the Savannah River Site:  H Canyon, Washington Savannah River Company, Aiken, South Carolina, April.

376

SRS (Savannah River Site), 2007i, SRS Environmental Report, High-Level Waste Disposition, WSRC Public Affairs, Aiken, South Carolina.

377

SRS (Savannah River Site), 2007j, Scope of Work C-SOW-K-00012, Revision 0, for Site Work (U), Plutonium Disposition Project (U) Project M09A, April.

378

SRS (Savannah River Site), 2007k, Scope of Work M-SOW-K-00020, Revision 0, for Heating, Ventilation, and Air Conditioning (HVAC) Systems (U), Plutonium Disposition Project (U) Project M09A, April.

379

SRS (Savannah River Site), 2007l, Scope of Work J-SOW-K-00003, Revision 1, for Health and Safety Monitoring System (U), Plutonium Disposition Project (U) Project M09A, April.

380

SRS (Savannah River Site), 2007m, Scope of Work E-SOW-K-00017, Revision 0, for Electrical Power Supply System (U), Plutonium Disposition Project (U) Project M09A, April.

381

SRS (Savannah River Site), 2007n, Scope of Work E-SOW-K-00018, Revision 0, for Public Address and Telecommunications Systems (U), Plutonium Disposition Project (U) Project M09A, April.

382

SRS (Savannah River Site), 2007o, Scope of Work F-SOW-K-00001, Revision 0, for Fire Protection System (U), Plutonium Disposition Project (U) Project M09A, April.

383

SRS (Savannah River Site), 2007p, Scope of Work M-SOW-K-00026, Revision 0, for Green Fuel Disassembly System (U), Plutonium Disposition Project (U) Project M09A, April.

283

SRS (Savannah River Site), 2007q, Scope of Work M-SOW-K-00013, Revision 0, for Feed Preparation System (U), Plutonium Disposition Project (U) Project M09A, April.

284

SRS (Savannah River Site), 2007r, Scope of Work M-SOW-K-00015, Revision 0, for Bagless Transfer System (U), Plutonium Disposition Project (U) Project M09A, April.

384

SRS (Savannah River Site), 2011, Interim Action Determination, Flexible Manufacturing Capability for the Mixed Fuel Fabrication Facility (MFFF), Savannah River Operations Office, Aiken, South Carolina, April 1.

106

SRS CAB (Savannah River Site Citizens Advisory Board), 2004, Recommendation 183, Glass Waste Storage Building #1 and #2 Long-Term Impact, Aiken, South Carolina, March 11.

385

WSRC (Westinghouse Savannah River Company), 2004, Closure Plan for the E-Area Low-level Waste Facility, WSRC-RP-2000-00425, Rev. 4, Aiken, South Carolina, May.

316

WSRC (Washington Savannah River Company), 2008, Surplus Plutonium Disposition Supplemental Environmental Impact Statement Data Call Response, Aiken, South Carolina.

338